Riedstadt sewage treatment plant Riedstadt DE

Installation of pneumatic outflow controls in the storm-water sedimentation basin of the sewage treatment plant

The pneumatic discharge control system installed in 2011 at the storm water tank in the direct inlet of the sewage treatment plant ensures stable hydraulic conditions. Previously, there had been regular incidents because the throttling device was unable to continuously feed the water from the stormwater tank, which is located in the main intake, to the sewage treatment plant.

Products in use

Proud of our craft!
Day after day, STEBATEC fitters honour our craft by carrying out installations of the highest quality that are a joy to the eye of the professional.
Robust, transparent, accurate, fast, low maintenance and reliable for wastewater, raw wastewater and rainwater.
Precise drain throttle for heavily polluted waste water. The IDM flow measurement for full filling is the central element of the almost self-cleaning, remotely operated and highly precise pneumatic discharge control PNA. The reliable and never-tiring flap with pneumatic drive and the pinch valve react quickly to changing flows and conditions.
Share this page …
Subscribe to our newsletter!

Let’s stay connected! Subscribe to our STEBAletter and receive regular news about our projects and activities.

STEBATEC AG
Mattenstrasse 6a
CH-2555 Brügg

T +41 32 373 15 71
info@stebatec.ch

STEBATEC GmbH
Heilbronner Straße 150
D-70191 Stuttgart

T +49 322 2109 3142
info@stebatec-messtechnik.de

Follow us …

Copyright 2020 © STEBATEC